Free federal bid radar
See which federal facility contracts in your state end soon, and who holds them.
Pick your state. You get every live bid in 8 facility trades, plus every contract whose current term ends within 180 days, with the holder and the dollar value. It costs nothing.
- 76live bids
- 7,030terms ending
- $146Kmedian value
Sources: SAM.gov contract opportunities and USAspending.gov awards.
Trades
Out for bid now
A full package, written from a real bid
Solicitation 12444327Q0002 is a real Forest Service request for janitorial quotes in Vermont, due January 4, 2027. The firm, Sample Cleaning Co., is invented so the package has answers in it. Text marked like this came from its 10 answers. Everything else comes from the solicitation. Read the notice on SAM.gov
- AgencyUSDA Forest Service, Green Mountain National Forest
- The work3 buildings in Manchester Center and Mount Tabor, VT
- Term1 base year and 4 option years from January 15, 2027
- Set-asideTotal small business, NAICS 561720
Compliance checklist
Every submission instruction in the solicitation, where it is written, and where this package answers it. 17 lines. The 9 that decide whether the quote gets read come first.
- Quote emailed to the contracting officer and in the inbox by Monday, January 4, 2027, 1:00 pm ETGeneral Notes, page 1 → Part 6, step 5
- 2 separate attachments, Technical Proposal and Price Quote, in Word, Excel or PDFGeneral Notes, page 1 → Part 6, step 4
- SAM.gov registration active for NAICS 561720 on the day you submit and on the day of awardGeneral Notes, page 1 and FAR 52.204-7 → Part 6, step 3
- A price on every line: 10 line items in each of 5 years, 50 in allSchedule of Items, pages 2 to 8 → Part 5
- A written Quality Control Plan inside the technical proposal. It becomes part of the contractFAR 52.212-2(a)(i)c and SOW 160 → Part 2, section 1.3
- Any SOW requirement you cannot meet, explained in detailFAR 52.212-2(a)(i)b → Part 2, section 1.2
- Resumes for the Site Manager / Supervisor and the assigned cleaners, plus equipment and materials listsFAR 52.212-2(a)(ii)a to c → Part 2, section 2 and the Attachment 10 forms
- A Subcontractor Retention and Workforce Stability Plan covering pay, retention, supervision and backup laborFAR 52.212-2(a)(iii)a to d → Part 2, section 3
- Similar projects from the last 3 years, and prices held firm for 90 days after the due dateFAR 52.212-2(a)(iv) and the 52.212-1 addendum, page 18 → Part 3 and the Price Quote cover line
Show the other 8 lines
- The offeror's ability to meet the schedule in the Statement of WorkFAR 52.212-2(a)(i)a → Part 2, section 1.1
- A methodology and a proposed schedule of workFAR 52.212-2(a)(ii) → Part 2, section 2
- A materials list with biobased products markedAttachment 6 and FAR 52.223-2 → Attachment 10 materials form
- Key personnel who can pass a federal background investigationQualification Requirements, page 18 and SOW 140 → Part 2, section 2.1
- Past performance sheets and a signed consent letter for any subcontractor doing 20% or moreFAR 52.212-2(a)(iv)a and Attachment 11 → Part 4
- SF 1449 blocks 12, 17, 23, 24 and 30 completedSF 1449, page 1 → Part 4
- Balanced pricing. The notes say unreasonably high, unrealistically low or unbalanced prices eliminate a quoteGeneral Notes, page 1 → Part 5
- Questions in by December 18, 1:00 pm ET, with the solicitation name and number in the subject line52.212-1 addendum, page 18 → Part 6, step 2
3 things that get this quote thrown out
- A blank price line. The General Notes say offerors who leave required information empty are unresponsive and out of the running.
- An email that lands after 1:00 pm ET on January 4. The notes warn that large attachments slow delivery and put confirming receipt on the offeror.
- A SAM.gov profile that is not active, or not registered for NAICS 561720.
2 things I flagged in the documents
Page 17 calls the subcontractor consent form "Attachment 13". The posting has 11 attachments and the form is Attachment 11.
The Attachment 10 questionnaire still carries an older solicitation number, 12444323Q0011. Both go on the question list for the contracting officer, due December 18, 1:00 pm ET.
Technical proposal
Written in the order FAR 52.212-2 lists the evaluation factors, so each numbered heading matches a factor the evaluators score. Shortened to fit this page.
1. Technical approach
1.1 Schedule. Sample Cleaning Co. cleans the Manchester Ranger District Office on Tuesdays and Fridays between 4:00 and 10:00 pm, and the Mt. Tabor Administrative Building on Wednesdays between 10:00 am and 4:00 pm SOW 200.10. From May 1 through October 31 the Mt. Tabor Quarters gets 3 visits a week: standard cleans on Mondays and Thursdays and the intensive kitchen and restroom clean on Wednesdays SOW 222.0. Monthly tasks ride with the first visit of each month 220.2. Semi-annual work is booked for the last 2 weeks of April and October, with carpet dates agreed with the COR 2 weeks ahead 220.3, 220.32.
1.2 Requirements we cannot meet. None. 1 item waits on the COR: the Visitor Center floor is slate, and any stone-safe product needs COR approval before use 220.16. We send the safety data sheet for our pH-neutral stone cleaner in week 1.
1.3 Quality Control Plan. The site supervisor checks every visit against the Attachment 8 checklist and signs it before leaving SOW 262. Restrooms carry a 100% quality level in Attachment 7, so they get 2 checks: the cleaner, then the supervisor. A deficiency the COR reports is answered the same business day and corrected on the next visit, or within 10 business days for semi-annual work SOW 263. Each Friday the supervisor reads the week's checklists for repeat misses and retrains on site.
2. Project methodology
2.1 Personnel. Site Manager / Supervisor: 9 years running janitorial crews, 4 of them at a county courthouse. Assigned personnel: 2 cleaners, each with the firm more than 3 years. All 3 complete the background check forms at award and work business hours until cleared SOW 140.
2.2 Equipment and 2.3 Materials. Listed on the Attachment 10 forms, with each biobased product marked against the Attachment 6 categories.
3. Subcontractor retention and workforce stability plan
a. Pay. Wage determination 2015-4139, revision 35, sets janitors at $19.35 an hour plus $5.92 in health and welfare. We pay $21.50. The SOW itself reports 2.1 to 2.7% unemployment around Manchester and rents of $1,700 to $3,200 a month SOW 110.
b. Retention. A $250 bonus at 6 and 12 months for cleaners with no unplanned absences.
c. Supervision. 1 supervisor to 2 cleaners, on site every week.
d. Backup labor. 2 trained on-call cleaners who live within 20 miles cover a call-out the same day. No work is subcontracted, so no partner reaches the 20% line that triggers a consent letter.
Past performance
The solicitation asks for projects from the last 3 years that match this one in scope, size and complexity. It rates each firm Acceptable, Neutral or Unacceptable. A firm with no record is rated Neutral.
| Client and work | Dates | Value |
|---|---|---|
| County courthouse, 14,000 sq ft, cleaned 5 nights a week | 2023 to now | $86,000 a year |
| Medical office, 6,200 sq ft, 3 visits a week with floor care twice a year | 2022 to 2025 | $41,000 a year |
| State park visitor center and bunkhouse, seasonal, May to October | 2024 and 2025 | $19,500 a season |
Each job gets a paragraph tying it to this one. The bunkhouse job maps to the Mt. Tabor Quarters: seasonal, shared kitchen, 3 visits a week. The courthouse maps to the after-hours work at the ranger office, where cleaners enter with access codes and need a background check.
The same 3 jobs, with a contact name and phone for each, go on the Past Performance and Experience form in Attachment 10.
Forms
Filled as far as the 10 answers allow. Every blank you must fill yourself is marked with a dashed outline.
SF 1449, page 1
Attachment 10, technical evaluation forms
- Experience and past performance questionnaire, items 1 to 6: filled.
- Personnel form, equipment form and materials form: filled.
- Sustainable acquisition form: filled, with products matched to the Attachment 6 categories.
Attachment 11, consent letter
Left out. It applies only to a subcontractor or teaming partner doing 20% or more of the work.
Pricing worksheet
The solicitation's own line items and quantities, ready for your numbers. I never suggest your price.
| Line | Base year service | Qty | Unit price |
|---|---|---|---|
| 0001 | Ranger office, twice weekly | 104 | $ |
| 0002 | Ranger office, monthly | 12 | $ |
| 0003 | Ranger office, semi-annual | 2 | $ |
| 0004 | Mt. Tabor admin, weekly | 52 | $ |
| 0005 | Mt. Tabor admin, semi-annual | 2 | $ |
| 0006 | Quarters, twice weekly, May to Oct | 52 | $ |
| 0007 | Quarters, third weekly intensive | 26 | $ |
| 0008 | Quarters, monthly, May to Oct | 6 | $ |
| 0009 | Quarters, semi-annual | 2 | $ |
| 0010 | Quarters, annual | 1 | $ |
The same 10 lines repeat for option years 1 to 4, 50 lines in all, with a total for each year and each building.
What the current contract paid. Germrip LLC holds the Forest Service order for regular janitorial services at the Manchester Ranger District: $104,288 since February 2023, with its term ending January 14, 2027, the day before this one starts. See it on USAspending
How price is scored. Base year plus all 4 options, plus 6 more months at the option year 4 rates. Technical factors together count for significantly more than price.
Submission steps
- December 8, 1:00 pm ET. Site visit at 2538 Depot Street, Manchester Center. Bidders are urged and expected to go. The notes say failing to inspect is no ground for a claim after award.
- December 18, 1:00 pm ET. Last moment for questions, by email, with the solicitation name and number in the subject line.
- Before you send. Open SAM.gov and confirm your registration reads Active and lists NAICS 561720.
- Save 2 files. Technical Proposal and Price Quote, each as a PDF, Word or Excel file. The package names them with the solicitation number and your firm name.
- January 4, 2027, before 1:00 pm ET. Email both files to the contracting officer named in the notice. Send it that morning at the latest.
- Confirm receipt. Ask for a reply saying the quote arrived. The solicitation makes that the offeror's job.
I check the notice every day until it closes. An amendment that changes the response reaches you the same day, with the package updated.
You read the package before you pay for it
4 steps from a bid on your radar to a quote in the contracting officer's inbox.
- Say yes to a bid1 firm per bid. The first yes gets it.
- Answer 10 questionsAbout 10 minutes: past jobs, crew, equipment, insurance.
- Package in 48 hoursAll 6 parts, written from the solicitation and your answers.
- Price it and submit itYour numbers, your SAM.gov account. I watch for amendments until it closes.
$349
per package. The median contract on this radar is worth $145,911.
- The invoice comes only after you read the package and tell me you are submitting it.
- 1 firm per bid. Once you take a bid, no other firm gets a package for it.
- A flat fee. Nothing is tied to winning, and no package promises a win.
- You set your prices and submit the bid yourself. I never ask for your SAM.gov login.
Bidding 2 or more times a month? $499 a month covers the Friday radar and 2 packages. Extra packages are $299. Cancel any month.
The 10 questions
This is the whole form. Your answers save on this device as you type. Send them when you are done, or reply to my email with the answers instead.
Questions contractors ask
Where does the radar come from?
2 public federal sources. Live bids come from SAM.gov's file of active contract opportunities. Contract holders, values and end dates come from USAspending.gov award records. The radar was last refreshed on November 27, 2026.
Does an ending term mean a new bid is coming?
Sometimes. Agencies extend many contracts through option years, and some work stops. The radar shows the date the current term ends and nothing more, so you know which offices to watch and who holds the work today.
What if I read the package and decide not to bid?
Then there is no invoice. Tell me what made it a no, and that is the end of it.
Will you tell me what to charge?
No. The pricing worksheet lists the solicitation's line items and shows what the current contract paid when public records have it. The number is yours.
Which trades does the radar cover?
8 for now: janitorial (NAICS 561720), landscaping (561730), facilities support (561210), waste collection (562111), security systems (561621), pest control (561710), plumbing and HVAC (238220) and machinery repair (811310).